This couple had never built anything until they bought a piece of land with a small house a few years ago. After thorough studying of building instructions and tips they decided to construct the new house by themselves. This work took two years.
Their land
Cuttin' some trees
Groundwork
100mm of shingle for drrrrainage
Concrete results
Outer walls
Outer walls raised and ready for roof. Walls consist of ca 300mm insulation.
Roof'd
Starting to see the shape of the rooms Gypsum walls Bathroom + Sauna under development Bathroom walls and door to sauna Entrance hallway The office
"Floating" desk of steel pipe, MDF board and a 3mm rubber sheet to cover it all
One year
Other side of the office Kitchen
100% IKEA
Walk in pantry
Living room Sauna
Pinewood interior and a sauna with 50kgs of rock
Bedroom
Outside view, two years after start Deck Floorplan

100mm of shingle for drrrrainage
Concrete results
Outer walls
Outer walls raised and ready for roof. Walls consist of ca 300mm insulation.
Roof'd
Starting to see the shape of the rooms Gypsum walls Bathroom + Sauna under development Bathroom walls and door to sauna Entrance hallway The office
"Floating" desk of steel pipe, MDF board and a 3mm rubber sheet to cover it all
One year
Other side of the office Kitchen
100% IKEA
Walk in pantry
Living room Sauna
Pinewood interior and a sauna with 50kgs of rock
Bedroom
Outside view, two years after start Deck Floorplan

No comments:
Post a Comment